Name | English Name | Operator | Output | Method | Wikidata |
---|---|---|---|---|---|
PLTS Cirata | Cirata Floating PV Power Plant | Pembangkitan Jawa Bali Masdar Solar Energi | 145 MW | photovoltaic | |
PLTS Likupang | 15.00 MW | photovoltaic | |||
PLTS Oelpuah | PT Lembaga Elektronik Nasional (LEN) | 5.00 MW | photovoltaic | ||
PLTS Pringgabaya | 5.00 MW | photovoltaic | |||
PLTS Sambelia | 5.00 MW | photovoltaic | |||
PLTS Selong | 5.00 MW | photovoltaic | |||
PLTS Sengkol | 5.00 MW | photovoltaic | |||
PLTS Maumere | 2.00 MW | ||||
PLTS Cirata | PT Pembangkitan Jawa Bali | 1.00 MW | photovoltaic | ||
PLTS Kayubihi Bangli | PLN | 1.00 MW | photovoltaic | ||
PLTS Kubu Karangasem Bali | PLN | 1.00 MW | photovoltaic | ||
Pembangkit Listrik Tenaga Surya | Solar PV Power Plant | PT Buana Energi Surya Persada | 1.00 MW | ||
PLTS Gili Trawangan | PLN | 600 kW | photovoltaic | ||
PLTS Tambak Lorok | 561 kW | photovoltaic | |||
[unnamed] | 330 kW | photovoltaic | |||
PLTS Terpusat Kabaena Timur Desa Tapahuka | 200 kW | photovoltaic | |||
PLTS Gili Air | PLN Persero | 160 kW | photovoltaic | ||
PLTS Muara Nusa Dua | 100 kW | ||||
PLTS Tahalupu | 100 kW | photovoltaic | |||
PLTS Pulau Tiga | 75 kW | photovoltaic | |||
PLTS Gili Meno | PLN | 60 kW | photovoltaic | ||
PLTS Long Nawang | |||||
PLTS Sara | |||||
PLTS Werua | |||||
solar power plant | photovoltaic | ||||
[unnamed] | |||||
[unnamed] | |||||
[unnamed] | |||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic | ||||
[unnamed] | |||||
[unnamed] | |||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic | ||||
[unnamed] | photovoltaic |