宝峰、杨柳田风电场 is a wind power plant operated by 湖南华电-舜远新能 with a total output of 100 MW.
Generators
| Source | Output | Count | Total output |
|---|---|---|---|
| wind | 5.00 MW | 20 | 100 MW |
宝峰、杨柳田风电场 is a wind power plant operated by 湖南华电-舜远新能 with a total output of 100 MW.
| Source | Output | Count | Total output |
|---|---|---|---|
| wind | 5.00 MW | 20 | 100 MW |