East Toba River Hydroelectric Project is a hydro power plant operated by Innergex with a total output of 147 MW.
Generators
Source | Output | Count | Total output |
---|---|---|---|
hydro | 0 kW | 2 | 0 kW |
East Toba River Hydroelectric Project is a hydro power plant operated by Innergex with a total output of 147 MW.
Source | Output | Count | Total output |
---|---|---|---|
hydro | 0 kW | 2 | 0 kW |