Name | English Name | Operator | Output | Method | Wikidata |
---|---|---|---|---|---|
Kariba North Bank Power Station | ZESCO | 1,080 MW | water-storage | Q1367609 | |
Kafue Gorge Upper Power Station | ZESCO | 990 MW | water-storage | ||
Kafue Gorge Lower Power Plant | ZESCO | 750 MW | Q56373922 | ||
Itezhi-Tezhi Hydroelectric Station | Itezhi-Tezhi Hydroelectric Station | Itezhi Tezhi Power Company | 120 MW | water-storage | Q1461688 |
Lusiwasi Lower Hydroelectric Power Station | ZESCO | 86 MW | run-of-the-river | ||
Victoria Falls Station B (Underground) | 60 MW | ||||
Victoria Falls Station C | ZESCO | 40.00 MW | run-of-the-river | ||
Mulungushi Power Station | Lunsemfwa Hydro Power Company | 32.00 MW | |||
Lunsemfwa Power Station | Lunsemfwa Hydro Power Company | 24.00 MW | |||
Lusiwasi Upper Hydroelectric Power Station | ZESCO | 15.00 MW | run-of-the-river | ||
Lunzua Hydroelectric Power Station | ZESCO | 14.80 MW | run-of-the-river | ||
Victoria Falls Station A | Zesco | 8.00 MW | run-of-the-river | ||
Chishimba Hydroelectric Power Station | ZESCO | 6.20 MW | |||
Musando Falls II | ZESCO | 5.00 MW | water-storage | ||
Musonda Falls I | ZESCO | 5.00 MW | water-storage | ||
Shiwa Ng'andu Hydro Power Station | ZESCO | 1.00 MW | |||
Old Lunzua Hydroelectric Power Station | ZESCO | 750 kW | run-of-the-river | ||
Zengamina Hydro Station | 700 kW | run-of-the-river | Q8069072 | ||
Kasanjinku | 590 kW | run-of-the-river |