Kapichira Hydroelectric Power Station |
|
EGENCO |
130 MW | water-storage | Q6366596 |
Nkula B Hydroelectric Plant |
|
EGENCO |
100 MW | run-of-the-river | Q7042563 |
Tedzani III Hydroelectric Plant |
|
EGENCO |
62 MW | run-of-the-river | Q55634856 |
Tedzani I and II Hydroelectric Plants |
|
EGENCO |
40.00 MW | run-of-the-river | Q55634856 |
Nkula A Hydroelectric Plant |
|
EGENCO |
35.10 MW | run-of-the-river | Q55074876 |
Tedzani IV Hydroelectric Plant |
|
EGENCO |
19.10 MW | run-of-the-river | Q55634856 |
Ruo–Ndiza Hydroelectric Power Station |
|
Mulanje Renewable Energy |
8.20 MW | | Q96403136 |
Wovwe Hydroelectric Power Station |
Wovwe Hydroelectric Power Station |
EGENCO |
4.35 MW | run-of-the-river | Q55637942 |