Faridabad Thermal Power Plant is a gas power plant operated by NTPC with a total output of 430 MW.
Generators
| Source | Output | Count | Total output |
|---|---|---|---|
| gas | 215 MW | 2 | 430 MW |
Faridabad Thermal Power Plant is a gas power plant operated by NTPC with a total output of 430 MW.
| Source | Output | Count | Total output |
|---|---|---|---|
| gas | 215 MW | 2 | 430 MW |