Faridabad Thermal Power Plant is a gas power plant operated by NTPC with a total output of 430 MW.
Generators
Source | Output | Count | Total output |
---|---|---|---|
gas | 215 MW | 2 | 430 MW |
Faridabad Thermal Power Plant is a gas power plant operated by NTPC with a total output of 430 MW.
Source | Output | Count | Total output |
---|---|---|---|
gas | 215 MW | 2 | 430 MW |