国能石嘴山第一发电有限公司 (Guoneng Shizuishan-1 (Units 5 & 6) power station) is a coal power plant operated by 国家能源-北京国电/宁夏电投 with a total output of 700 MW.
Generators
| Source | Output | Count | Total output |
|---|---|---|---|
| [unspecified] | 350 MW | 2 | 700 MW |
国能石嘴山第一发电有限公司 (Guoneng Shizuishan-1 (Units 5 & 6) power station) is a coal power plant operated by 国家能源-北京国电/宁夏电投 with a total output of 700 MW.
| Source | Output | Count | Total output |
|---|---|---|---|
| [unspecified] | 350 MW | 2 | 700 MW |