中铝山西新材料有限公司自备电站(河津电厂二期) (Hejin (Phase II) power station) is a coal power plant operated by 中国铝业/晋控电力 with a total output of 600 MW.
Generators
Source | Output | Count | Total output |
---|---|---|---|
[unspecified] | 2 |
中铝山西新材料有限公司自备电站(河津电厂二期) (Hejin (Phase II) power station) is a coal power plant operated by 中国铝业/晋控电力 with a total output of 600 MW.
Source | Output | Count | Total output |
---|---|---|---|
[unspecified] | 2 |