Central Termoelétrica do Caminho Novo is a diesel power plant operated by Eletricidade dos Açores with a total output of 8.23 MW.
Generators
Source | Output | Count | Total output |
---|---|---|---|
diesel | 1.54 MW | 2 | 3.08 MW |
diesel | 1.01 MW | 4 | 4.05 MW |
diesel | 1.20 MW | 1 | 1.20 MW |